{"id":3173,"date":"2022-01-06T14:23:51","date_gmt":"2022-01-06T14:23:51","guid":{"rendered":"https:\/\/www.rahavardenergy.ir\/en\/?page_id=3173"},"modified":"2022-01-06T19:12:07","modified_gmt":"2022-01-06T19:12:07","slug":"power-gen","status":"publish","type":"page","link":"https:\/\/www.rahavardenergy.ir\/en\/sections\/power-gen\/","title":{"rendered":"Power Generation"},"content":{"rendered":"<p><section id=\"bt_section69fd50d2c21f3\"  class=\"boldSection bottomSemiSpaced gutter boxed inherit\" ><div class=\"port\"><div class=\"boldCell\"><div class=\"boldCellInner\"><div class=\"boldRow \" ><div class=\"boldRowInner\"><div class=\"rowItem col-md-12 col-ms-12  btTextLeft\"  data-width=\"12\"><div class=\"rowItemContent\" ><div class=\"btClear btSeparator topSemiSpaced noBorder\" ><hr><\/div><header class=\"header btClear medium btDash bottomDash  regular\" ><div class=\"dash\"><h3><span class=\"headline\">Introduction<\/span><\/h3><\/div><\/header><div class=\"btClear btSeparator topSmallSpaced bottomSmallSpaced noBorder\" ><hr><\/div><div class=\"btText\" ><\/p>\n<p>Rahavard Energy covers all types of power generation projects from Combined Cycle, Thermal Power Plant to Renewable and CHP, CCHP through high qualified experts within its structure. More than 52,000 MW power generation projects have been Engineered, Designed, and Supervised by this company including 19,000 MW Gas Turbine and 33,000 MW Combined Cycle Power Plants.<\/p>\n<p>Also feasibility studies of more than 3000 MW Thermal Power Plants have been done by Rahavard Energy. In 2016, Rahavard Energy was involved in 5000 MW power generation projects globally.<\/p>\n<p>Rahavard Energy activities in the field of power generation are divided into following categories:<\/p>\n<ul>\n<li>Combined Cycle and Steam Power Plants<\/li>\n<li>Gas Power Plants and Utilities<\/li>\n<li>Power Plants Rehabilitation &amp; Retrofitting<\/li>\n<li>Dispersed Generation<\/li>\n<\/ul>\n<p>\n<\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/section><section id=\"bt_section69fd50d2c2383\"  class=\"boldSection bottomSemiSpaced gutter boxed inherit\" ><div class=\"port\"><div class=\"boldCell\"><div class=\"boldCellInner\"><div class=\"boldRow \" ><div class=\"boldRowInner\"><div class=\"rowItem col-md-12 col-ms-12  btTextLeft\"  data-width=\"12\"><div class=\"rowItemContent\" ><header class=\"header btClear medium btDash bottomDash  regular\" ><div class=\"dash\"><h3><span class=\"headline\">Capabilities<\/span><\/h3><\/div><\/header><div class=\"btClear btSeparator topSmallSpaced bottomSmallSpaced noBorder\" ><hr><\/div><div class=\"btText\" ><\/p>\n<div class=\"item active\">\n<div class=\"row\">\n<div class=\"col-md-12 content-show \">\n<ul>\n<li>Design and Consultancy Services for Thermal Power Plants, Power Plants Cooling Systems, Dispersed Generation and Renewable Energies (Wind, Solar and Geothermal)<\/li>\n<li>Power Plant Management Consultancy Services<\/li>\n<li>Design Review &amp; Site Supervision<\/li>\n<li>Power plant Rehabilitation<\/li>\n<li>Energy Recovery Consultancy Services<\/li>\n<li>Feasibility Studies for Different Projects<\/li>\n<\/ul>\n<\/div>\n<\/div>\n<\/div>\n<p>\n<\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/section><section id=\"bt_section69fd50d2c2481\"  class=\"boldSection bottomSemiSpaced gutter boxed inherit\" ><div class=\"port\"><div class=\"boldCell\"><div class=\"boldCellInner\"><div class=\"boldRow \" ><div class=\"boldRowInner\"><div class=\"rowItem col-md-12 col-ms-12  btTextLeft\"  data-width=\"12\"><div class=\"rowItemContent\" ><header class=\"header btClear medium btDash bottomDash  regular\" ><div class=\"dash\"><h3><span class=\"headline\">Projects<\/span><\/h3><\/div><\/header><div class=\"btClear btSeparator topSmallSpaced bottomSmallSpaced noBorder\" ><hr><\/div><div class=\"btText\" ><\/p>\n<table id=\"tblId\" dir=\"ltr\" style=\"width: 100%; border-color: #1d2b57; border-style: solid; background-color: #e0e0e0;\">\n<tbody>\n<tr>\n<td style=\"width: 100%;\" colspan=\"5\">Power plants engineered and supervised by Rahavard Energy.<\/td>\n<\/tr>\n<tr style=\"background-color: #1d2b57;\">\n<td style=\"width: 25.5217%;\"><span style=\"color: #ffffff;\"><strong>Project name<\/strong><\/span><\/td>\n<td style=\"width: 14.1252%;\"><span style=\"color: #ffffff;\"><strong>Start date<\/strong><\/span><\/td>\n<td style=\"width: 15.2488%;\"><span style=\"color: #ffffff;\"><strong>Finish date<\/strong><\/span><\/td>\n<td style=\"width: 21.8299%;\"><span style=\"color: #ffffff;\"><strong>Location<\/strong><\/span><\/td>\n<td style=\"width: 23.2745%;\"><span style=\"color: #ffffff;\"><strong>Scope of work<\/strong><\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">Standardization of basic design exclusive of power block in gas section of combined cycles<\/td>\n<td style=\"width: 14.1252%;\">2010<\/td>\n<td style=\"width: 15.2488%;\">2011<\/td>\n<td style=\"width: 21.8299%;\">Tehran<\/td>\n<td style=\"width: 23.2745%;\">Design and engineering services<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">Data exchange package project<\/td>\n<td style=\"width: 14.1252%;\">2010<\/td>\n<td style=\"width: 15.2488%;\">2011<\/td>\n<td style=\"width: 21.8299%;\">Tehran<\/td>\n<td style=\"width: 23.2745%;\">Design and engineering services<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">Yazd Farab power plant<\/td>\n<td style=\"width: 14.1252%;\">2010<\/td>\n<td style=\"width: 15.2488%;\">2011<\/td>\n<td style=\"width: 21.8299%;\">Yazd<\/td>\n<td style=\"width: 23.2745%;\">Detail and Basic Design for Heler cooling system<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">Yazd Farab power plant<\/td>\n<td style=\"width: 14.1252%;\">2009<\/td>\n<td style=\"width: 15.2488%;\">2012<\/td>\n<td style=\"width: 21.8299%;\">Yazd<\/td>\n<td style=\"width: 23.2745%;\">Design and engineering services<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">Abadan power plant<\/td>\n<td style=\"width: 14.1252%;\">2009<\/td>\n<td style=\"width: 15.2488%;\">2012<\/td>\n<td style=\"width: 21.8299%;\">Abadan<\/td>\n<td style=\"width: 23.2745%;\">Site supervision<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">Cooling system-Kahnooj, Khoramshahr, Orumiyeh<\/td>\n<td style=\"width: 14.1252%;\">2009<\/td>\n<td style=\"width: 15.2488%;\">2010<\/td>\n<td style=\"width: 21.8299%;\">Tehran<\/td>\n<td style=\"width: 23.2745%;\">Engineering services<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">No. 5 amendment for 22 units power plant<\/td>\n<td style=\"width: 14.1252%;\">2009<\/td>\n<td style=\"width: 15.2488%;\">2009<\/td>\n<td style=\"width: 21.8299%;\">Nekah-Kazeroon-Yazd-Kerman<\/td>\n<td style=\"width: 23.2745%;\">Design and engineering services<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">5 year engineering services<\/td>\n<td style=\"width: 14.1252%;\">2009<\/td>\n<td style=\"width: 15.2488%;\">2009<\/td>\n<td style=\"width: 21.8299%;\">Tehran<\/td>\n<td style=\"width: 23.2745%;\">Design and engineering services for Niam 3D Modeling plan-PDMS<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">Islam Abad Gharb power plant<\/td>\n<td style=\"width: 14.1252%;\">2009<\/td>\n<td style=\"width: 15.2488%;\">2009<\/td>\n<td style=\"width: 21.8299%;\">Islamabad<\/td>\n<td style=\"width: 23.2745%;\">Design and engineering services<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">5 year engineering services<\/td>\n<td style=\"width: 14.1252%;\">2008<\/td>\n<td style=\"width: 15.2488%;\">2009<\/td>\n<td style=\"width: 21.8299%;\">Tehran<\/td>\n<td style=\"width: 23.2745%;\">Design and engineering service for Niam plan<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">Iran LNG power plant<\/td>\n<td style=\"width: 14.1252%;\">2008<\/td>\n<td style=\"width: 15.2488%;\">2010<\/td>\n<td style=\"width: 21.8299%;\">Kangan<\/td>\n<td style=\"width: 23.2745%;\">Design and engineering services<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">The main ACC cooling system-4 units power plant<\/td>\n<td style=\"width: 14.1252%;\">2008<\/td>\n<td style=\"width: 15.2488%;\">2010<\/td>\n<td style=\"width: 21.8299%;\">Isfahan-Abadan<\/td>\n<td style=\"width: 23.2745%;\">Design and engineering services<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">5 year engineering services<\/td>\n<td style=\"width: 14.1252%;\">2008<\/td>\n<td style=\"width: 15.2488%;\">2009<\/td>\n<td style=\"width: 21.8299%;\">Tehran<\/td>\n<td style=\"width: 23.2745%;\">Technical specifications for combined cycle power plant based on Niam plan<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">5 year engineering services<\/td>\n<td style=\"width: 14.1252%;\">2008<\/td>\n<td style=\"width: 15.2488%;\">2008<\/td>\n<td style=\"width: 21.8299%;\">Tehran<\/td>\n<td style=\"width: 23.2745%;\">Dual coding system in MAPNA factories documents-Iran LNG project<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">22 units power plant<\/td>\n<td style=\"width: 14.1252%;\">2008<\/td>\n<td style=\"width: 15.2488%;\">2011<\/td>\n<td style=\"width: 21.8299%;\">Jahrom<\/td>\n<td style=\"width: 23.2745%;\">Site supervision and engineering services<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">22 units power plant<\/td>\n<td style=\"width: 14.1252%;\">2008<\/td>\n<td style=\"width: 15.2488%;\">2010<\/td>\n<td style=\"width: 21.8299%;\">Shirvan<\/td>\n<td style=\"width: 23.2745%;\">Design and engineering services<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">22 units power plant<\/td>\n<td style=\"width: 14.1252%;\">2008<\/td>\n<td style=\"width: 15.2488%;\">2010<\/td>\n<td style=\"width: 21.8299%;\">Jahrom<\/td>\n<td style=\"width: 23.2745%;\">Design and engineering services<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">Kahnooj power plant<\/td>\n<td style=\"width: 14.1252%;\">2008<\/td>\n<td style=\"width: 15.2488%;\">2012<\/td>\n<td style=\"width: 21.8299%;\">Kahnooj<\/td>\n<td style=\"width: 23.2745%;\">Design and engineering services<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">Kahnooj power plant<\/td>\n<td style=\"width: 14.1252%;\">2008<\/td>\n<td style=\"width: 15.2488%;\">2012<\/td>\n<td style=\"width: 21.8299%;\">Kahnooj<\/td>\n<td style=\"width: 23.2745%;\">Site supervision<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">Isfahan2 power plant<\/td>\n<td style=\"width: 14.1252%;\">2008<\/td>\n<td style=\"width: 15.2488%;\">2011<\/td>\n<td style=\"width: 21.8299%;\">Zavareh<\/td>\n<td style=\"width: 23.2745%;\">Design and engineering services<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">Isfahan2 power plant<\/td>\n<td style=\"width: 14.1252%;\">2008<\/td>\n<td style=\"width: 15.2488%;\">2011<\/td>\n<td style=\"width: 21.8299%;\">Zavareh<\/td>\n<td style=\"width: 23.2745%;\">Site supervision<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">Parehsar power plant<\/td>\n<td style=\"width: 14.1252%;\">2008<\/td>\n<td style=\"width: 15.2488%;\">2009<\/td>\n<td style=\"width: 21.8299%;\">Parehsar<\/td>\n<td style=\"width: 23.2745%;\">Detail and Basic Design for cooling system<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">5 year engineering services<\/td>\n<td style=\"width: 14.1252%;\">2007<\/td>\n<td style=\"width: 15.2488%;\">2008<\/td>\n<td style=\"width: 21.8299%;\">Tehran<\/td>\n<td style=\"width: 23.2745%;\">Preparation of standard documents for Niam plan and Basic Design for Sanandaj, Parehsar, Abadan and Iran LNG power plants<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">Genaveh power plant<\/td>\n<td style=\"width: 14.1252%;\">2007<\/td>\n<td style=\"width: 15.2488%;\">2010<\/td>\n<td style=\"width: 21.8299%;\">Genaveh<\/td>\n<td style=\"width: 23.2745%;\">Design and engineering services<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">22 units power plant<\/td>\n<td style=\"width: 14.1252%;\">2007<\/td>\n<td style=\"width: 15.2488%;\">2010<\/td>\n<td style=\"width: 21.8299%;\">Sanandaj<\/td>\n<td style=\"width: 23.2745%;\">Site supervision<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">22 units power plant<\/td>\n<td style=\"width: 14.1252%;\">2007<\/td>\n<td style=\"width: 15.2488%;\">2011<\/td>\n<td style=\"width: 21.8299%;\">Shirvan<\/td>\n<td style=\"width: 23.2745%;\">Site supervision<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">22 units power plant<\/td>\n<td style=\"width: 14.1252%;\">2007<\/td>\n<td style=\"width: 15.2488%;\">2010<\/td>\n<td style=\"width: 21.8299%;\">Sanandaj<\/td>\n<td style=\"width: 23.2745%;\">Design and engineering services<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">22 units power plant<\/td>\n<td style=\"width: 14.1252%;\">2007<\/td>\n<td style=\"width: 15.2488%;\">2010<\/td>\n<td style=\"width: 21.8299%;\">Abadan<\/td>\n<td style=\"width: 23.2745%;\">Design and engineering services<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">Yazd thermal-solar, Parehsar &amp; Sanandaj power plant<\/td>\n<td style=\"width: 14.1252%;\">2007<\/td>\n<td style=\"width: 15.2488%;\">2008<\/td>\n<td style=\"width: 21.8299%;\">Yazd-Sanandaj-Parehsar<\/td>\n<td style=\"width: 23.2745%;\">Consulting and engineering services<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">Parehsar power plant<\/td>\n<td style=\"width: 14.1252%;\">2007<\/td>\n<td style=\"width: 15.2488%;\">2010<\/td>\n<td style=\"width: 21.8299%;\">Parehsar<\/td>\n<td style=\"width: 23.2745%;\">Design and engineering services<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">Yazd thermal-solar power plant-Gas turbine and steam turbine sections<\/td>\n<td style=\"width: 14.1252%;\">2006<\/td>\n<td style=\"width: 15.2488%;\">2010<\/td>\n<td style=\"width: 21.8299%;\">Yazd<\/td>\n<td style=\"width: 23.2745%;\">Design and engineering services<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">Damavand power plant<\/td>\n<td style=\"width: 14.1252%;\">2006<\/td>\n<td style=\"width: 15.2488%;\">2010<\/td>\n<td style=\"width: 21.8299%;\">Varamin<\/td>\n<td style=\"width: 23.2745%;\">Site supervision<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">Yazd thermal-solar power plant<\/td>\n<td style=\"width: 14.1252%;\">2006<\/td>\n<td style=\"width: 15.2488%;\">2010<\/td>\n<td style=\"width: 21.8299%;\">Yazd<\/td>\n<td style=\"width: 23.2745%;\">Site supervision<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">Damavand power plant<\/td>\n<td style=\"width: 14.1252%;\">2005<\/td>\n<td style=\"width: 15.2488%;\">2007<\/td>\n<td style=\"width: 21.8299%;\">Varamin<\/td>\n<td style=\"width: 23.2745%;\">Design and engineering services<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">22 units power plant<\/td>\n<td style=\"width: 14.1252%;\">2005<\/td>\n<td style=\"width: 15.2488%;\">2007<\/td>\n<td style=\"width: 21.8299%;\">Damavand<\/td>\n<td style=\"width: 23.2745%;\">Design and engineering services<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">22 units power plant<\/td>\n<td style=\"width: 14.1252%;\">2004<\/td>\n<td style=\"width: 15.2488%;\">2007<\/td>\n<td style=\"width: 21.8299%;\">Kerman<\/td>\n<td style=\"width: 23.2745%;\">Design and engineering services<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">22 units power plant<\/td>\n<td style=\"width: 14.1252%;\">2003<\/td>\n<td style=\"width: 15.2488%;\">2007<\/td>\n<td style=\"width: 21.8299%;\">Nekah<\/td>\n<td style=\"width: 23.2745%;\">Design and engineering services<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">22 units power plant<\/td>\n<td style=\"width: 14.1252%;\">2003<\/td>\n<td style=\"width: 15.2488%;\">2007<\/td>\n<td style=\"width: 21.8299%;\">Kazeroon<\/td>\n<td style=\"width: 23.2745%;\">Design and engineering services<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">5 combined cycle power plant-11 units<\/td>\n<td style=\"width: 14.1252%;\">2000<\/td>\n<td style=\"width: 15.2488%;\">2003<\/td>\n<td style=\"width: 21.8299%;\">Shariati<\/td>\n<td style=\"width: 23.2745%;\">Design and engineering services<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">5 combined cycle power plant-11 units<\/td>\n<td style=\"width: 14.1252%;\">1999<\/td>\n<td style=\"width: 15.2488%;\">2003<\/td>\n<td style=\"width: 21.8299%;\">Neyshabour<\/td>\n<td style=\"width: 23.2745%;\">Design and engineering services<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">5 combined cycle power plant-11 units<\/td>\n<td style=\"width: 14.1252%;\">1998<\/td>\n<td style=\"width: 15.2488%;\">2003<\/td>\n<td style=\"width: 21.8299%;\">Khoy<\/td>\n<td style=\"width: 23.2745%;\">Design and engineering services<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">5 combined cycle power plant-11 units<\/td>\n<td style=\"width: 14.1252%;\">1998<\/td>\n<td style=\"width: 15.2488%;\">2003<\/td>\n<td style=\"width: 21.8299%;\">Fars<\/td>\n<td style=\"width: 23.2745%;\">Design and engineering services<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">5 combined cycle power plant-11 units<\/td>\n<td style=\"width: 14.1252%;\">1997<\/td>\n<td style=\"width: 15.2488%;\">2002<\/td>\n<td style=\"width: 21.8299%;\">Shahid Rajaee<\/td>\n<td style=\"width: 23.2745%;\">Design and engineering services<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 25.5217%;\">Montazer Ghaem power plant<\/td>\n<td style=\"width: 14.1252%;\">1996<\/td>\n<td style=\"width: 15.2488%;\">2000<\/td>\n<td style=\"width: 21.8299%;\">Karaj<\/td>\n<td style=\"width: 23.2745%;\">Design and engineering services<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\n<\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/section><\/p>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":3178,"parent":3175,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-3173","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/www.rahavardenergy.ir\/en\/wp-json\/wp\/v2\/pages\/3173","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.rahavardenergy.ir\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.rahavardenergy.ir\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.rahavardenergy.ir\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.rahavardenergy.ir\/en\/wp-json\/wp\/v2\/comments?post=3173"}],"version-history":[{"count":7,"href":"https:\/\/www.rahavardenergy.ir\/en\/wp-json\/wp\/v2\/pages\/3173\/revisions"}],"predecessor-version":[{"id":3225,"href":"https:\/\/www.rahavardenergy.ir\/en\/wp-json\/wp\/v2\/pages\/3173\/revisions\/3225"}],"up":[{"embeddable":true,"href":"https:\/\/www.rahavardenergy.ir\/en\/wp-json\/wp\/v2\/pages\/3175"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.rahavardenergy.ir\/en\/wp-json\/wp\/v2\/media\/3178"}],"wp:attachment":[{"href":"https:\/\/www.rahavardenergy.ir\/en\/wp-json\/wp\/v2\/media?parent=3173"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}